Stage 1.

Stage 1.

Design Commencement (required prior to design)
  1. Undertake contour Survey of existing site
  2. Sewer Pegout (Required if development is nearby sewer)
Design & Development Application Preparation
  1. Architectural Drawings
  2. 3D Drawings
  3. Schedule of Materials
  4. Statement of environmental effects
  5. Shadow Diagrams
  6. Site Analysis Plan
  7. Stormwater Plans (Prepared by an Independent Stormwater Engineer)
  8. Landscaping Plan (Prepared by an Independent Landscape Architect/Designer)
  9. BASIX certificate 
Stage 2.

Stage 2.

Stage 3.

Stage 3.

Lodgement to Council/ Governing Authority
  1. Lodge all required documentation to council
  2. Liase with council regarding design
  3. Follow up council to track application status
Construction Certificate & Consultant Amendments (Post design approval)
  1. Engage an accredited private certifier to obtain a construction certificate
  2. Prepare all documents for Construction Certificate
  3. Engage a registered Structural Engineer & prepare structural drawings 
Stage 4.

Stage 4.

Note: All design stages are subject to change in accordance with council guidelines and property/land characteristics.